them to finish if Bill hammers the first 5 nails, then Jeff haammers for 3 minutes, then Bill finishes the job??
ANSWER IS 5.4 MINUTESBill can hammer 20 nails in 8 mins.Jeff can do the same job in only 5mins. How long will it take?
Ok you need some rates:
Let:
bR = rate at which bill hammers nails
jR = rate at which jeff hammers nails
bR = 2/5 minutes/nail
jR = 1/4 minutes/nail
Now to find the time:
1) Bill take 5 nails * 2/5 minutes/nail = 2 minutes to hammer 5 nails
2) If Jeff hammers for 3 minutes he will nail 12 nails
3) 20 - 17 = 3 nails it takes bill 2/5 minutes/nail = 6/5
total time I get is 6.2 minutesBill can hammer 20 nails in 8 mins.Jeff can do the same job in only 5mins. How long will it take?
Bill can hammer 5 nails in 2 mins (1/4th of number of nails %26amp; time taken)
Jeff can hammer 5 nails in 5/4 mins (1/4th of number of nails %26amp; time taken) = 1.25mins
So for 15 nails, Jeff takes 3*1.25 = 3.75
Total time = 2mins (Bill for 5 nails) %26amp; 3.75 (Jeff for rest of nails)
= 5.75
';Bill hammers the first 5 nails';
5 nails 脳 (8 minutes/20 nails) = 2 minutes
';Jeff hammers for 3 minutes';
3 minutes 脳 (20 nails/5 minutes) = 12 nails
';Bill finishes the job';
6 nails remaining
6 nails 脳 (8 minutes/20 nails) = 2.4 minutes
total time = 2 + 3 + 2.4
= 5.4 minutes
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment